Wednesday, August 24, 2022

We got the caravan into its final position this evening. I had filled a hole behind the hydrangea bushes with concrete and a piece of rebar. The winch was attached to that and Elliott hauled the caravan the last 2 feet. We can now remove anything underneath that we don’t need, like piping, and then let out the air from the tires, then stabilize it at both ends. Then the gutting work can begin.



No comments:

Post a Comment